This is a bathroom that i did in Fairfax VT. I was hired to level the floor and remove the old shower and replace with a new one, also plumbing was involved
Above you can see, where the trim is leaning on the floor that the floor is very unlevel. It measured to be off by 2" on the right side. My job, fix it!
In this picture to the left, i am showing the old shower, the gap on the side of the shower is the entrance to the shower, i will build a wall there for the new shower to have a little support. The entrance will be moved to the front
In this picture to the left, i am showing the old shower, the gap on the side of the shower is the entrance to the shower, i will build a wall there for the new shower to have a little support. The entrance will be moved to the front
These 2 bottom pictures are pictures after the floor has been fixed, the linolieum has been layed and the shower has been installed
As you may recall i had to lift the right side of the floor 2" to make it level, i also had to do the plumbing on the shower because this shower was a few inches bigger then the previous on. Also i had to fix the plumbing drain on the toilet as i lifted the floor and the toilet couldnt bee hooked back up with the plumbing being in the floor now. So yes, i had to raise it.